Scheduling clause: Copy, customize, and use instantly
Introduction
A scheduling clause outlines the timelines, milestones, and deadlines for the performance of the responsibilities under the agreement. It sets expectations for when specific tasks, deliverables, or services are due and establishes the process for handling delays, extensions, and modifications to the schedule.
Below are templates for scheduling clauses tailored to different scenarios. Copy, customize, and insert them into your agreement.
Standard scheduling clause
This variation applies when setting a general schedule for performance.
[Party Name] agrees to complete the tasks and deliverables outlined in this Agreement according to the following schedule: [specific timeline or deadlines]. Both parties acknowledge that timely performance is essential, and delays will be handled as outlined in this Agreement.
Scheduling for deliverables clause
This variation applies when scheduling is tied to specific deliverables.
[Party Name] shall deliver [specific deliverables] on or before the following dates: [list deadlines for each deliverable]. Delays in meeting these deadlines must be communicated to [other party] in writing and may result in [specific consequences] as per the terms of this Agreement.
Milestone-based scheduling clause
This variation applies when the schedule is based on achieving milestones.
The parties agree to the following project milestones, each with associated deadlines:
- [Milestone 1]: [date or timeline]
- [Milestone 2]: [date or timeline]
- [Milestone 3]: [date or timeline] Failure to meet these milestones will result in [penalty or consequence], unless otherwise agreed upon by both parties.
Scheduling with flexibility clause
This variation applies when some flexibility in scheduling is provided.
Both parties agree to the proposed schedule, with an understanding that dates may be adjusted by mutual written agreement due to unforeseen circumstances or force majeure events. Any change to the schedule must be documented and agreed upon in writing by both parties.
Scheduling extension clause
This variation applies when extensions to the schedule are allowed under certain conditions.
If [Party Name] is unable to meet any deadline specified in this Agreement due to circumstances beyond their control, [Party Name] may request an extension of up to [X] days, subject to approval by [other party]. Extensions will only be granted if the delay is not due to [Party Name]'s fault or negligence.
Scheduling for completion of work clause
This variation applies when the schedule is tied to the completion of work.
[Party Name] agrees to complete the work outlined in this Agreement within the following timeframe: [date or range of dates]. The work will be considered complete when [specific criteria for completion] are met. Delays in completion will be subject to the terms outlined in this Agreement.
Scheduling for periodic reviews clause
This variation applies when periodic reviews are required throughout the project.
[Party Name] agrees to conduct periodic reviews of the work in progress as follows:
- First review: [date or time frame]
- Second review: [date or time frame] These reviews will assess progress and determine whether any adjustments to the schedule or scope are needed. Delays or failures to meet review expectations may result in [penalty or consequence].
Scheduling for phased delivery clause
This variation applies when the project is delivered in phases.
[Party Name] will deliver the project in the following phases:
- Phase 1: [description and deadline]
- Phase 2: [description and deadline]
- Phase 3: [description and deadline] Each phase will be reviewed by [other party], and subsequent phases will not proceed until the prior phase is approved. Any delays in one phase may result in delays in the overall project timeline.
Scheduling for specific project dates clause
This variation applies when specific dates for project tasks or milestones are agreed upon.
[Party Name] agrees to complete [specific tasks or deliverables] by the following dates:
- Task 1: [date]
- Task 2: [date]
- Task 3: [date] Failure to meet these dates may result in [penalty or corrective action], unless otherwise agreed to by both parties in writing.
Scheduling for completion of services clause
This variation applies to the scheduling of service-related tasks.
[Party Name] shall provide the services outlined in this Agreement according to the following schedule:
- Service 1: [date or time frame]
- Service 2: [date or time frame] [Party Name] will notify [other party] if any delay is expected in the performance of the services and will work in good faith to resolve any scheduling issues that arise.
Scheduling with advance notice clause
This variation applies when advance notice is required for scheduling changes.
[Party Name] agrees to provide at least [X] days' written notice prior to any changes to the agreed schedule, including any modifications to deadlines or milestones. Such notice should include the reason for the change and proposed adjustments to the timeline.
Scheduling for ongoing maintenance clause
This variation applies when the schedule involves ongoing maintenance.
[Party Name] shall perform ongoing maintenance as follows:
- Maintenance for Service 1: [date or time frame]
- Maintenance for Service 2: [date or time frame] All maintenance tasks will be completed within the agreed timeline, and any delays will be communicated promptly to [other party].
Scheduling with penalties for delays clause
This variation applies when penalties for delays are included in the schedule.
[Party Name] agrees to meet the following deadlines for project completion:
- Deadline 1: [date]
- Deadline 2: [date] In the event of a delay caused by [Party Name], a penalty of [X]% of the total project cost will apply for each day beyond the deadline.
Scheduling for resource allocation clause
This variation applies when resources are scheduled.
[Party Name] agrees to allocate the necessary resources, including personnel, equipment, and materials, for the completion of the tasks outlined in this Agreement, according to the following schedule:
- Resource allocation for Task 1: [date]
- Resource allocation for Task 2: [date] Any delays in resource availability will be communicated and addressed within [X] days.
Scheduling for task dependencies clause
This variation applies to tasks that depend on other tasks.
The completion of [Task A] is a prerequisite for starting [Task B]. [Party Name] agrees to complete [Task A] by [date] to ensure that [Task B] can commence without delay. Any delays in completing [Task A] will automatically extend the timeline for [Task B].
Scheduling for holiday breaks clause
This variation applies when holiday breaks are considered in the schedule.
[Party Name] agrees to complete the deliverables outlined in this Agreement, considering the following holiday breaks:
- Any work that would otherwise be scheduled during these breaks will be rescheduled to the next available business day.
Scheduling for remote work clause
This variation applies when the work involves remote services.
[Party Name] agrees to provide remote services according to the following schedule:
- Service 1 (remote): [date]
- Service 2 (remote): [date] Any delays or adjustments in the schedule for remote services will be communicated and mutually agreed upon in writing.
Scheduling for project kick-off clause
This variation applies to the scheduling of a project kick-off.
The project will officially kick off on [start date], with an initial meeting scheduled for [date]. Both parties agree that the kick-off meeting will be essential for setting clear expectations and timelines for the project's duration.
Scheduling for review and approval clause
This variation applies when tasks require review and approval before proceeding.
[Party Name] will submit completed deliverables for review and approval by [other party] on the following schedule:
- Deliverable 1: [date]
- Deliverable 2: [date] Each deliverable will be reviewed within [X] days, and any necessary revisions must be completed by [date].
Scheduling for completion of contract obligations clause
This variation applies when the contract obligations need to be completed by specific dates.
[Party Name] agrees to complete all contractual obligations by the following deadlines:
- Obligation 1: [date]
- Obligation 2: [date] Failure to meet these deadlines will trigger the consequences specified in the agreement, including the potential for contract termination.
Scheduling for review of contract amendments clause
This variation applies to the scheduling of reviews for contract amendments.
[Party Name] agrees to review any proposed amendments to this Agreement within [X] days of receipt. The parties will schedule a meeting to discuss proposed amendments, with a final decision made no later than [date].
Scheduling for phase-based work clause
This variation applies when the work is divided into phases.
The project will be completed in the following phases, with specific deadlines for each phase:
- Phase 1: [date]
- Phase 2: [date]
- Phase 3: [date] Each phase must be completed before proceeding to the next, and delays in any phase will affect subsequent deadlines.
Scheduling for post-project review clause
This variation applies when a post-project review is part of the schedule.
Upon completion of the project, a post-project review will be conducted on [date]. Both parties will assess the deliverables, discuss any challenges encountered during execution, and finalize any remaining issues.
Scheduling for resource availability clause
This variation applies when the schedule is based on resource availability.
[Party Name] agrees to complete the tasks outlined in this Agreement, provided the necessary resources, including personnel and equipment, are available according to the following schedule:
- Resource 1 availability: [date]
- Resource 2 availability: [date] Any delays in resource availability will be addressed promptly to minimize disruptions to the project.
Scheduling for regular status updates clause
This variation applies when regular status updates are required.
[Party Name] agrees to provide [other party] with regular status updates on the following schedule:
- Weekly update: [day of the week]
- Monthly summary: [date] These updates will include details on progress, completed tasks, and any obstacles that may affect the schedule.
Scheduling for client feedback sessions clause
This variation applies when client feedback is incorporated into the schedule.
[Party Name] will schedule regular feedback sessions with [other party] on the following dates to discuss progress and gather input on the deliverables:
- Feedback Session 1: [date]
- Feedback Session 2: [date] Delays in providing feedback will result in a corresponding delay in the project timeline.
Scheduling for training and onboarding clause
This variation applies to scheduling training or onboarding.
[Party Name] agrees to provide training for [other party] on the following schedule:
- Initial training session: [date]
- Follow-up training session: [date] Any delays in the scheduled training will be communicated in advance and rescheduled promptly.
Scheduling for adjustments due to unforeseen events clause
This variation applies to adjusting the schedule due to unforeseen events.
In the event of unforeseen circumstances, such as [force majeure events], the parties agree to adjust the project schedule accordingly. A revised timeline will be agreed upon within [X] days of such an event.
Scheduling for rescheduling missed appointments clause
This variation applies when appointments are missed and need to be rescheduled.
If any scheduled appointments or meetings are missed by either party, they will be rescheduled at the earliest available time mutually agreed upon by both parties. Failure to reschedule within [X] days may result in [penalty or consequence].
Scheduling for integration of third-party services clause
This variation applies when third-party services are part of the schedule.
[Party Name] agrees to coordinate the integration of third-party services according to the following schedule:
- Service Integration 1: [date]
- Service Integration 2: [date] Any delays in third-party service delivery will affect the overall project schedule, and [Party Name] will work with third parties to mitigate these delays.
Scheduling for contingency plans clause
This variation applies when contingency plans need to be incorporated into the schedule.
In the event of unforeseen disruptions or delays, [Party Name] agrees to implement contingency plans as follows:
- Contingency Plan 1: [specific contingency]
- Contingency Plan 2: [specific contingency] The parties will adjust the schedule to accommodate necessary corrective actions.
Scheduling for external dependencies clause
This variation applies when external factors affect the schedule.
[Party Name] acknowledges that the completion of certain tasks is dependent on third parties or external factors. The schedule will be adjusted based on the availability of these external dependencies, and any delays from external parties will be communicated promptly.
Scheduling for coordination of team efforts clause
This variation applies to the coordination of team efforts across different parties.
[Party Name] agrees to coordinate the efforts of its internal team members and external collaborators according to the following schedule:
- Team coordination meeting 1: [date]
- Team coordination meeting 2: [date] Failure to attend or participate in coordination efforts will lead to delays in the project timeline.
Scheduling for confirmation of readiness clause
This variation applies when readiness must be confirmed before tasks begin.
[Party Name] agrees to confirm readiness to begin the project at least [X] days before the scheduled start date. Any delays in confirming readiness will result in a corresponding delay to the overall schedule.
Scheduling for delayed approvals clause
This variation applies when approvals affect the schedule.
[Party Name] agrees to complete all tasks according to the agreed timeline, but if any approvals or decisions from [other party] are delayed, the project schedule will be adjusted accordingly. The delay in approvals will add [X] days to the overall timeline.
Scheduling for time zone differences clause
This variation applies when the parties are in different time zones.
Both parties acknowledge the time zone differences and agree to schedule all meetings and calls based on [Party Name]’s business hours in [time zone] and [other party]’s business hours in [time zone], ensuring that meeting times are mutually convenient.
Scheduling for urgent requests clause
This variation applies when urgent requests are made outside the original schedule.
In the event of an urgent request that deviates from the original schedule, [Party Name] will make reasonable efforts to accommodate the request within [X] days. However, any changes to the original timeline must be agreed upon by both parties.
Scheduling for consecutive workdays clause
This variation applies when the schedule requires consecutive workdays.
[Party Name] agrees to work [X] consecutive workdays to complete the agreed-upon deliverables. If there is a disruption in consecutive workdays, the schedule will be extended by the number of days affected by the disruption.
Scheduling for weekly checkpoints clause
This variation applies when weekly checkpoints are part of the schedule.
Both parties agree to schedule weekly checkpoint meetings on [day of the week] at [time]. These meetings will assess the progress of the project and identify any potential delays or adjustments needed to stay on track with the overall schedule.
Scheduling for project review and feedback clause
This variation applies when regular reviews and feedback are required.
[Party Name] agrees to deliver completed project phases for review by [other party] at the following intervals:
- First review: [date]
- Second review: [date] The feedback from each review will be incorporated into the next phase, and delays in providing feedback may result in project delays.
Scheduling for adjustments based on deliverable reviews clause
This variation applies when the schedule needs to accommodate adjustments based on reviews.
[Party Name] agrees to adjust the schedule for subsequent deliverables based on the review and feedback provided by [other party]. Each phase will be reevaluated after [X] days to ensure all feedback is incorporated.
Scheduling for early termination of work clause
This variation applies when work can be terminated early based on the schedule.
Either party may terminate the work outlined in this Agreement early, provided [X] days' written notice is given. Any early termination of work will result in an adjustment of the overall project schedule and deliverables.
Scheduling for testing and quality checks clause
This variation applies to scheduling time for testing and quality checks.
[Party Name] agrees to schedule the following quality assurance checks and testing periods:
- Testing Phase 1: [date]
- Testing Phase 2: [date] The schedule will be adjusted based on the outcome of testing, with any delays being communicated and addressed promptly.
Scheduling for adjustments based on team availability clause
This variation applies when team availability affects the schedule.
[Party Name] acknowledges that the availability of key team members may affect the overall project timeline. If any critical personnel are unavailable, the schedule will be adjusted by [X] days to accommodate their availability.
Scheduling for buffer time clause
This variation applies to allow for buffer time in the schedule.
[Party Name] agrees to include [X] days of buffer time in the project schedule to account for unexpected delays, such as supplier issues, personnel unavailability, or unforeseen circumstances. This buffer time will not be used unless required to maintain project timelines.
Scheduling for advanced preparation and setup clause
This variation applies when advanced preparation is required for specific tasks.
[Party Name] agrees to allocate [X] days in advance for preparation and setup of materials, personnel, or equipment necessary for the execution of tasks outlined in this Agreement. Any delays in preparation will lead to an adjustment in the project timeline.
Scheduling for early project completion clause
This variation applies when the project is completed ahead of schedule.
[Party Name] may complete all deliverables ahead of the scheduled timeline, provided that early completion does not compromise the quality of work. Any early completion will be communicated and documented in writing.
Scheduling for concurrent project phases clause
This variation applies when multiple phases run concurrently.
[Party Name] agrees to complete multiple project phases concurrently as outlined in the following schedule:
- Phase 1 and Phase 2: [date] Any delays in one phase will not affect the schedule of the other phases, unless dependencies exist.
Scheduling for coordination with third-party vendors clause
This variation applies when the schedule is dependent on third-party vendors.
[Party Name] agrees to coordinate the schedule for third-party vendors to ensure that their deliverables are integrated into the overall project timeline. Delays caused by third-party vendors will result in schedule adjustments as necessary.
Scheduling for fixed project deadlines clause
This variation applies to fixed deadlines that cannot be adjusted.
[Party Name] agrees to complete the project within the following fixed deadlines:
- Deadline 1: [date]
- Deadline 2: [date] No changes to these deadlines will be allowed unless agreed upon by both parties in writing, and failure to meet these deadlines may result in penalties.
Scheduling for project wrap-up and documentation clause
This variation applies when the schedule includes project wrap-up and documentation.
[Party Name] agrees to complete the final project wrap-up and documentation by [date]. This includes final reports, all relevant documentation, and any other items required for project closure.
Scheduling for adjustments based on stakeholder feedback clause
This variation applies when adjustments are needed based on feedback from stakeholders.
[Party Name] agrees to adjust the schedule based on feedback from key stakeholders. Each feedback session will be scheduled within [X] days, and any necessary adjustments will be incorporated into the project schedule.
Scheduling for milestone-based approvals clause
This variation applies when approvals are required at milestones.
[Party Name] will seek approval from [other party] at the following milestones:
- Milestone 1: [date]
- Milestone 2: [date] If approval is delayed at any milestone, the project schedule will be adjusted accordingly.
Scheduling for multiple teams working on different tasks clause
This variation applies when different teams are working on tasks at different times.
[Party Name] agrees to schedule the work in such a way that different teams can perform tasks concurrently. Each team's schedule will be aligned, but delays in one team’s deliverables will result in a reallocation of resources and a potential adjustment in the overall schedule.
Scheduling for project dependencies clause
This variation applies when one task depends on the completion of another.
[Party Name] agrees that the following tasks are dependent on the completion of earlier tasks:
- Task 1 depends on Task 2 being completed by [date].Any delays in the completion of Task 2 will push back the scheduled timeline for Task 1 and affect the overall project completion.
Scheduling for flexible working hours clause
This variation applies when the schedule allows flexible working hours.
[Party Name] agrees to work within flexible hours as required to complete the tasks outlined in this Agreement. The exact schedule will be adjusted based on team availability and project needs, with all critical deadlines remaining unchanged.
Scheduling for late-stage adjustments clause
This variation applies when adjustments are needed late in the project.
[Party Name] acknowledges that some tasks may require adjustments or additions during the later stages of the project. Such changes will be incorporated into the schedule upon mutual agreement, and new deadlines will be set if necessary.
Scheduling for off-hours work clause
This variation applies when work is scheduled outside of regular hours.
[Party Name] agrees to complete certain tasks outside of regular working hours to meet tight deadlines or accommodate project needs. Any off-hours work will be scheduled in advance with [other party] to ensure availability and coordination.
Scheduling for interim deliverables clause
This variation applies when interim deliverables are required throughout the project.
[Party Name] agrees to submit interim deliverables for review at the following intervals:
- Interim Deliverable 1: [date]
- Interim Deliverable 2: [date] These deliverables will be reviewed by [other party] and any necessary changes will be incorporated before proceeding with the next phase.
Scheduling for follow-up meetings clause
This variation applies when follow-up meetings are necessary.
Both parties agree to hold follow-up meetings at the following times to review progress:
- Follow-up Meeting 1: [date]
- Follow-up Meeting 2: [date] Any delays in meeting these scheduled times will require the meeting to be rescheduled within [X] days.
Scheduling for revised deadlines clause
This variation applies when deadlines need to be revised due to unforeseen circumstances.
[Party Name] agrees to notify [other party] of any delays or changes to the original deadlines within [X] days. New deadlines will be proposed in writing and mutually agreed upon to ensure the successful completion of the project.
Scheduling for preparation and review phase clause
This variation applies when a preparation and review phase is required.
Prior to the final submission of deliverables, [Party Name] agrees to schedule a preparation and review phase lasting [X] days, during which all materials will be reviewed, adjustments will be made, and final approvals will be obtained.
Scheduling for extended work period clause
This variation applies when the work period is extended.
If [Party Name] needs additional time to complete a deliverable, an extended work period will be agreed upon. The extended period will not exceed [X] days unless both parties mutually agree to further adjustments.
Scheduling for dependency-driven deadlines clause
This variation applies when deadlines depend on the completion of previous tasks.
[Party Name] agrees that the completion of each task is dependent on the successful completion of prior tasks. The schedule
will be adjusted accordingly if there are delays in any prior tasks, and any missed deadlines will push back subsequent deadlines by [X] days.
Scheduling for fixed review periods clause
This variation applies when the schedule includes fixed review periods.
[Party Name] agrees to schedule fixed review periods every [X] weeks during the term of this Agreement to assess the project’s progress. These review periods will allow both parties to make adjustments to the schedule if necessary.
Scheduling for staggered deadlines clause
This variation applies when deadlines are staggered across tasks.
[Party Name] agrees to complete the tasks in stages with staggered deadlines as follows:
- Task 1: [date]
- Task 2: [date]
- Task 3: [date] Each task’s deadline is independent, but delays in one task may impact the overall timeline.
Scheduling for resource availability clause
This variation applies when resources need to be scheduled.
[Party Name] will allocate the necessary resources, including personnel and equipment, to meet the following project deadlines:
- Resource availability for Task 1: [date]
- Resource availability for Task 2: [date] If resources are unavailable on these dates, the schedule will be adjusted accordingly.
Scheduling for client-directed changes clause
This variation applies when the client can request schedule changes.
[Party Name] agrees to accommodate client-directed changes to the schedule, provided that such changes are requested in writing at least [X] days before the scheduled task. Any changes will be incorporated into the project timeline, and revised deadlines will be communicated promptly.
Scheduling for final review and sign-off clause
This variation applies when a final review and sign-off are required before project completion.
[Party Name] agrees to schedule a final review meeting for project completion on [date]. [Other party] must approve or request modifications within [X] days of the meeting, and the final sign-off will take place no later than [date].
Scheduling for time-sensitive tasks clause
This variation applies to time-sensitive tasks that require immediate attention.
[Party Name] agrees to prioritize the following time-sensitive tasks and complete them by the following deadlines:
- Task 1: [date]
- Task 2: [date] Any delays in completing these tasks will result in immediate rescheduling of subsequent work.
Scheduling for mandatory downtime clause
This variation applies when scheduled downtime is necessary.
[Party Name] will schedule mandatory downtime for system updates, maintenance, or other activities that could impact the project schedule. Downtime will occur on [dates], and all tasks requiring system access will be rescheduled around these periods.
Scheduling for availability of key personnel clause
This variation applies when the availability of key personnel is critical to the schedule.
[Party Name] agrees to ensure the availability of key personnel for critical project phases. If any key personnel become unavailable, [Party Name] will notify [other party] at least [X] days in advance, and the schedule will be adjusted accordingly.
Scheduling for early-stage milestones clause
This variation applies to early-stage milestones in the project timeline.
[Party Name] agrees to meet the following early-stage milestones by the specified dates:
- Milestone 1: [date]
- Milestone 2: [date] These early-stage milestones are crucial for the continuation of the project, and delays in meeting these milestones will affect the subsequent schedule.
Scheduling for collaborative working periods clause
This variation applies when collaborative working periods are needed.
[Party Name] and [other party] agree to schedule the following collaborative working periods, where both parties will work together to complete tasks:
- Collaborative Period 1: [date to date]
- Collaborative Period 2: [date to date] Failure to meet collaborative deadlines will delay overall project progress.
Scheduling for buffer for unforeseen delays clause
This variation applies when buffer time is included for unforeseen delays.
[Party Name] agrees to include a buffer period of [X] days within the overall project schedule to account for any unforeseen delays. If the buffer period is used, both parties will reassess the project timeline and adjust deadlines as needed.
Scheduling for milestone tracking and adjustment clause
This variation applies when milestones need to be tracked and adjusted.
[Party Name] agrees to track project milestones and adjust the schedule accordingly. If a milestone is missed or delayed, the schedule will be updated with new completion dates, and both parties will agree on a plan to mitigate further delays.
Scheduling for third-party vendor coordination clause
This variation applies when third-party vendors are part of the project.
[Party Name] agrees to coordinate with third-party vendors as part of the project schedule. The timeline will account for the availability of these vendors and any delays caused by them, and the schedule will be adjusted accordingly.
Scheduling for maximum work period clause
This variation applies to define a maximum work period for certain tasks.
[Party Name] agrees that the following tasks will be completed within the maximum time period specified:
- Task 1: [X] hours/days
- Task 2: [X] hours/days If a task exceeds this time period, the schedule will be adjusted to reflect the delay caused by the overrun.
Scheduling for post-delivery feedback clause
This variation applies to schedule feedback sessions after deliverables are completed.
[Party Name] will schedule post-delivery feedback sessions on the following dates:
- Feedback Session 1: [date]
- Feedback Session 2: [date] Any delays in receiving feedback will be incorporated into the revised schedule, with an updated completion date.
Scheduling for rescheduling due to holidays clause
This variation applies when holidays affect the schedule.
Both parties agree to adjust the schedule to accommodate public holidays or company holidays. Any work or deadlines that fall on a holiday will be rescheduled for the next available working day.
Scheduling for final phase project timeline clause
This variation applies when the final phase timeline is specified.
[Party Name] agrees to complete the final phase of the project according to the following schedule:
- Final phase start date: [date]
- Final phase completion date: [date] Delays in this phase will lead to an adjustment in the project’s overall timeline.
Scheduling for final testing and adjustments clause
This variation applies when final testing and adjustments are scheduled.
[Party Name] agrees to complete final testing by [date] and incorporate any necessary adjustments into the final deliverable. Any delays in testing or failure to meet the deadline will result in a revised completion date.
Scheduling for milestone approval process clause
This variation applies when milestone approvals affect the schedule.
[Party Name] agrees that each project milestone will be submitted for approval by [other party] on the following dates:
- Milestone 1 approval: [date]
- Milestone 2 approval: [date] Failure to approve a milestone within [X] days will result in delays to subsequent project phases.
Scheduling for completion of regulatory approvals clause
This variation applies when regulatory approvals affect the schedule.
[Party Name] agrees to complete all necessary regulatory filings and obtain required approvals by [date]. Delays in obtaining regulatory approvals will impact the overall project timeline and may require an extension of the deadline.
Scheduling for final budget review clause
This variation applies when a final budget review impacts the schedule.
[Party Name] agrees to conduct a final budget review by [date] to ensure that the project stays within the agreed budget. Any discrepancies found will be addressed, and the project timeline may be adjusted based on required changes.
Scheduling for resource scaling clause
This variation applies when resources need to be scaled.
[Party Name] agrees to scale resources according to the following schedule to meet project needs:
- Resource scaling 1: [date]
- Resource scaling 2: [date] If resources are not available as scheduled, the project timeline may be adjusted accordingly.
This article contains general legal information and does not contain legal advice. Cobrief is not a law firm or a substitute for an attorney or law firm. The law is complex and changes often. For legal advice, please ask a lawyer.